Whole machine
【 Counting 】 The CX240C's potential is so great that I dare to go for it when there's something to do!
If there is a type of earthmoving excavator that does not 憷头 when encountering hard work, does not malfunction during continuous operation, and can even be temporarily pulled to mine, break rocks and topstone, it might be the Case CX240C.
Among the earthmoving machines of Case's "C era", the CX240C is the representative of the "classic of classics". It was originally designed to compete with 30-ton class excavators and is truly a heavy-duty earthmoving machine. Ten years ago, this tonnage could have been permanently used in mines for stone work. Because it features the exhilarating and fleeting movements, the rapid and swift working speed, as well as the carefree and pleasant driving pleasure.
Racing against time
"Money-sucking beast
If one is merely a laid-back machine operator or a laid-back boss, perhaps the CX240C cannot bring out much of its value. But if you wish to own a "Lu Fei's fast horse, Thunderbolt's startled bow", the CX240C was once the N0.1 in the hearts of many locals.
Whether it is the original imported CX240C, the domestic model CX240C-8, or the advanced CX260C, the pursuit of efficiency is the driving force behind them. Equipped with a 1.4-cubic-meter bucket (the CX260C bucket is 1.5 cubic meters); 140kW engine power; 28.9Mpa rotary motor The maximum rotational speed is 11.0r/min.
The CX240C can complete 360° rotation within 5.5 seconds. To ensure smooth and stable rotation speed, the rotation braking adopts spring self-locking and two-stage overflow buffer hydraulic contact.
The walking motor of CX240C adopts a variable axial piston, and it uses a wet disc brake for parking. The high-speed transfer speed can reach 5.5km/h, and the climbing ability can reach 35°.
Whether it's heavy-load loading and turning, repetitive hard soil excavation, or frequent transfer and transportation conditions, the CX240C is one of the few lightning heroes among equipment of the same tonnage.
Extraordinary times
"Launch" start
The global pandemic, coupled with the cooling of the real estate market, has made intermittent work halts the norm. The tight schedule has further shortened the duration of the project's commencement. Previously, one shift contained 700 cubic meters of soil, but now it might be necessary to load 1,000 cubic meters. It used to take one shift a day, but now it might take ten hours... At critical moments, the CX240C can truly step up.
The CX240C has three working modes: Advanced Automatic Mode, Heavy Load Mode and Super Power Mode. According to the different progress of the project, different working modes should be reasonably selected to achieve the desired speed, and a perfect balance can also be found between production capacity and fuel consumption.
The working hours can be increased, but the failure rate of the equipment must be low. The CX240C is standardly equipped with a reinforced working mechanism that has undergone durability treatment and is suitable for heavy-duty operations. The working mechanism adopts thicker high-grade steel, and reinforced ribs are designed at the stress concentration points on the structural components to ensure the safety of the structural components under high-load construction.
Recently, the epidemic has been frequent, and the prevention and control work remains urgent. We engineers should seize the tail end of 2022 and race against time within the limited time. CX240C is a reliable partner.
Winter is coming
Undeterred by wind and rain
It is reported that 2022 is a triple La Nina year, and the winter climate is far more complex than imagined. Widespread rain and snow are expected to hit again in the next two days. The adaptability of the equipment to bad weather will directly affect the operation efficiency.
Like other C-series aircraft, the Case CX240C is equipped with a new generation of cab. Its all-weather operating system caters to various climatic conditions. Eight air outlets provide better air circulation, allowing operators to work in a comfortable ambient temperature throughout the year. The CX240C handle and seat are all adjustable, allowing you to control the device in the most comfortable position at any time.
The CX240C cab is equipped with a 50pa preload, which can keep noise, dust and even germs out of the cab. The front window of the cab has no overlapping area, the strength of the cab has increased by 30%, the field of vision is wider and the safety performance is better.
Although the C-series models may soon come off the production line with honor, their actual performance will help owners achieve wealth and fulfill their dreams for a long time. Owners who plan to purchase an earthmoving machine before December 1st might as well get this Case CX240C or CX260C.
Related articles
- Counting the "wealth tools" of the C series: Choosing CX210C for supporting a family and s
- 【 User Says 】 Green New Force! XCMG pure electric mining trucks accelerate "zero-carbon mines&q
- 【 Annual Star Product 】 Liugong 4180D Motor Grader
- 【 New Product Debut 】 Exclusive Revelation! Why are XCMG's "Little bees" so skilled?
- 【 Good News Keeps Coming 】 XCMG's "Big G" sets off a wave of machine delivery!
- 【 Market Expansion 】 The FYG5186GSSF water sprinkler truck of Fangyuan Group has been put into servi
- 【 User Says 】 XCMG's "heavy tonnage" enters mines, getting more and more aggressive!
- 【 User Says 】 Good equipment! Start a business with XCMG and succeed with XCMG
- 【 User Praise 】 The Fangyuan WBZ800-D type stabilized soil mixing plant has been highly praised by u
- 【 Lingxing Tianxia 】 Stable and efficient output, continuously creating value! Shandong Lingong's E6

