Maintenance
The more skills you have, the better! Two maintenance methods for road rollers
1. Method for expelling air from fuel pipelines
During the operation of a diesel engine, it stalls due to a lack of diesel in the fuel tank. After the diesel engine is turned off, although diesel is added to the fuel tank, air has already entered the diesel pipeline at this time, and it is impossible to restore fuel supply by using the hand oil pump.
To remove the air in the diesel pipeline and ensure the smooth start of the diesel engine, we adopt the following methods: First, find a small basin and fill it with a certain amount of diesel, then place it slightly higher than the hand oil pump. Secondly, remove the diesel pipe connecting the fuel tank to the hand oil pump and insert it into this small basin of diesel. Secondly, use a hand oil pump to pump diesel and completely remove the air in the low-pressure oil circuit. Finally, after reassembling the diesel pipe connecting the fuel tank to the hand oil pump and conducting a test run, the diesel engine started normally.
2. Disposal methods for damaged solenoid valves
It is difficult to start the diesel engine. Each time it starts, it takes a relatively long time before the diesel engine can be started with difficulty. We initially believed that the poor atomization was caused by the wear of the fuel injector, but after inspection, both the fuel injector and the fuel injection pump were found to be in good condition. When checking the start solenoid valve again, it was found that its electromagnet had no attraction.
When we remove the start solenoid valve and pull the fuel valve stem connecting the fuel injection pump and the solenoid valve by hand, the diesel engine can start smoothly. This indicates that the solenoid valve has been damaged. If new solenoid valves cannot be purchased in the nearby market for the time being, we can use thin copper wire to bind the fuel injection pump valve stem to prevent it from returning to its original position, and thicken the solenoid valve gasket to prevent oil leakage from the fuel injection pump valve stem hole. After the above processing, the solenoid valve was reinstalled and the roller was put into use. Just replace it after purchasing the newly started solenoid valve.
- Pre
Winter is here, and it's very important to conduct regular inspections of bulldozers!
Although the manufacturing industry of medium and large-size...
- Next
You wouldn't know until you saw it! Key points for maintaining road rollers at different times
Every day1. Check the roller for any leakage of oil, water o...
Related articles
- These 15 precautions for operating bulldozers should be well understood!
- Check the excavator's rotational speed and set the idle stop method
- The excavator won't start. How can I solve this problem?
- Do a good job of checking the motor grader before starting it every day, and the boss's salary incre
- Is there crawling in the hydraulic system? Noise? "Technical sharing to solve your worries!&quo
- Guide you step by step to understand the commissioning procedure of a concrete mixing plant!To ensur
- Allison has launched the eGen PowerTM fully integrated zero-emission electric drive axle for medium
- Nord has launched the brand-new MAXXDRIVE®XT industrial gearbox - a powerful transmission device sui
- Even people in Shaanxi Province praise, "The Guangkang engine is so beautiful!"
- The Allison FuelSense® 2.0 transmission saves 12% of fuel for the Marseille - Provence metropolis