The half shaft of a crawler bulldozer is usually pressed in with a force of over 400kN and pulled out with specialized equipment. In factories without dedicated equipment, methods such as jack ejection, oxygen blowing cutting, and boring with boring machines are adopted for processing. The process is complex, the success rate is low and the labor intensity is high. We have summarized a simple and feasible method for disassembly and assembly.
When disassembling, first remove all parts of the side reduction device, then use the old support wheel housing 2 without an inner bearing sleeve to fit onto the half shaft 1, and tie a rope about 2 meters long to the support wheel housing. Fit a pad 3 at the end of the half shaft and tighten the fixed nut 4 at the end, with a torque of no less than 0.3k·N. Two people use a rope to pull the idler wheel housing 2 to strike the pad plate 3, thereby pulling out the half shaft 1.
When assembling, the nut 2 can be made first. Tighten it at the outer end of half shaft 1. While hitting the nut with a heavy object, tighten the lock nut on the inner side of the half shaft at the same time, and it can be smoothly installed.
- Pre
Analysis and Elimination of Oil Leakage in Crane Horizontal Hydraulic Cylinders
The horizontal hydraulic cylinder is the actuator that compl...
- Next
Installation, commissioning and application of the TSAP-2000AS mixer from South Korea
The TSAP-2000AS asphalt concrete mixer from South Korea has ...
Related articles
- Troubleshooting methods for abnormal noise from the main pump of the excavator
- Discussion on the Influence of Brake Fluid on the Braking Performance of Wheel Loaders
- Improved technology for articulated frame of ZL40/ZL50 loader
- Fault diagnosis methods for the vibration system of road rollers
- Troubleshooting methods for forklift gear shift thrust faults
- Sany Heavy Industry: Do you want to go for the top excavators? Go, go, go!
- Sales are far ahead! Liugong's National IV excavators are highly favored for their greater efficienc
- National IV S31 SY215C All-Rounder - Top-tier and flagship configuration of excavators, superior per
- Methods for maintaining tires of construction machinery
- Emergency repair methods for the auger sprocket of ABG511 paver