Maintenance
How to install and maintain the clutch of a loader?
The installation and maintenance of the clutch are:
When installing the clutch, calcium-based grease should be filled in the inner cavity of the release bearing. This machine has a grease nipple on the outside of the release bearing, and vaseline (grease) should be injected regularly and in limited quantities.
2) When installing the clutch, the locating manhole should first be inserted into the bearing to ensure that the splined holes of the main and auxiliary friction plate assemblies are concentric with the flywheel, facilitating the connection and installation of the transmission assembly.
3) The maintenance contents include cleaning the shell, checking and adjusting the separation gap, regularly injecting lubricating grease, and cleaning the oil stains on the friction plates when necessary.
Related articles
- The usage and maintenance techniques of loading machinery during the running-in period
- Analysis of the Causes and Maintenance of the deviation Fault of Crawler Crane Travel
- The FPT F28 diesel engine makes its debut in tandem with the new Cararo tractor
- Sales are far ahead! Liugong's National IV excavators are highly favored for their greater efficienc
- Extraordinary Decade: XCMG Resources Drilling and Mining Machinery Continues to Pursue "carbon&
- Focus on the brand: Kester F6 Milling Machine
- National IV S31 SY215C All-Rounder - Top-tier and flagship configuration of excavators, superior per
- Discussion on the Causes and Preventive Techniques of Diesel Engine Flywheel Imbalance
- A Brief Discussion on How to Reduce Power Loss in Hydraulic Systems
- Unmanned driving vs. Human drivers: What are the outstanding features of Sany's 5G unmanned electric

